6 Photovoltaic parks of total power 280kWp in Lakonia

Administrator of the project: Private projects
Site: Prefecture of Lakonia
Execution time frame: Connection to the GRID 11 & 12/2010, 09/2011 

photovoltaic park, Lakonia